The section is situated just before the first waterfall and had a slip on the inside of a corner in a series of bends. We were able to work with the contractor installing rock bolts, by cutting and building access tracks in layers down the face of the slip and building a concrete cut off drain and rebuilding the road way. These works were helped by the use of our zero swing range of excavators to 15 Tonne and 360 degree track dumper.
Location
Dorrigo, NSWEstimated Value
$500,000Completion Date
September 2020